| Pictures |
Description |
| Digging has started. The rough shape is in, with build up of the edge. The stake
in the middle is used a reference for all heights. |
| Another
angle at the same stage of construction. |
| Later
that day. The sides are cleaned up and bottom leveled. |
| A
cloud passes, softening the shadow. Final shaping is almost completed.
|
| Smokey
climbs in the inspect the hole. Luckly he approved and work continued. |
| My
friend Hep Ingham watchs it fill. He was a big help with digging and carrying
the liner. He also stayed to pull rinkles while it filled. Thanks Hep! |
| Filling
was done using the widest possible rubber hose to reduce resistance. This
was 50% faster then a normal garden hose. |
| It
finally full. Look at that clean water. Not yet ready for fish. I let it
sit for a day with circulation pumps going. |
| Test
fish are added and seem to be doing well. |
| Fish
come up to feed. Pump has been stopped to reduce glare. |
| Pump
running as a fountain. Smokey has found something. |
| The
end of summer and its a jungle.
|